Data Center Directory

3C1B HUAWEI FUSION DC ANKARA

3C1B HUAWEI FUSION DC ANKARA is an operational data center operated by 3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S. in Ankara, Türkiye. No power figure is public for this site yet. Likely chips: Huawei Ascend and NVIDIA China-market GPUs (guess).

Key facts

StatusOperational
Operator3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S.
AI chipsHuawei Ascend and NVIDIA China-market GPUs
Guess from the operator, not confirmed. Chinese operators use Huawei Ascend and export-limited NVIDIA chips.
Networks5 networks, 3 internet exchanges
PeeringDB.
AddressODTU Teknokent, Universiteler Mahallesi
Coordinates39.89538, 32.77455
Website3c1b.com/verimerkezi.html

Power and grid

Nearest high-voltage substationÇiğdem TM, 154 kV, 3.3 km away (TEİAŞ)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation380 kV Gölbaşı TM, 400 kV, 10.8 km away
HV substations within 10 km6
Power plants within 50 km1.2 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity476 g CO₂ per kWh (Türkiye, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3%
Industrial power priceEUR 0.054 per kWh (Türkiye, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.4 °C (2001 to 2025)
Cooling degree days341 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.46 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayHigh (40-80%) (Ankara)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

What chips does 3C1B HUAWEI FUSION DC ANKARA use?

No chips are reported. Based on the operator, the likely chips are Huawei Ascend and NVIDIA China-market GPUs.

How close is 3C1B HUAWEI FUSION DC ANKARA to the power grid?

The nearest high-voltage substation in OpenStreetMap is Çiğdem TM (154 kV), about 3.3 km away.

How clean is the power for 3C1B HUAWEI FUSION DC ANKARA?

The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.

Who operates 3C1B HUAWEI FUSION DC ANKARA?

3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S..

Data centers near Ankara

More 3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S. data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.