Acens Technologies
Acens Technologies is an operational data center operated by Acens Technologies in Alcobendas, Spain. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Acens Technologies |
| Networks | 1 networks PeeringDB. |
| Address | C/ San Rafael, 14 |
| Coordinates | 40.52641, -3.66113 |
| Website | acens.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 220 kV, 1.2 km away (Iberdrola) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 14 |
| Power plants within 50 km | 105 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 623 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Acens Technologies to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 1.2 km away.
How clean is the power for Acens Technologies?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates Acens Technologies?
Acens Technologies.
Data centers near Alcobendas
- Equinix MD6 816 m · 3 MW
- CyrusOne Madrid 1 1.1 km
- DATA4 - MAD1 1.4 km · 6 MW
- DATA4 Madrid-Alcobendas - MAD1 1.5 km
- Equinix MD2 - Madrid 1.6 km
- Equinix MD1 - Madrid 1.7 km
- Ibercom Madrid 1.7 km
- Vozelia Telecom Madrid 4.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.