Acer eDC
Acer eDC is an operational data center operated by Acer e-Enabling Data Center in Taoyuan City, Taiwan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Acer e-Enabling Data Center |
| Address | No.69, Lane 368, Xinhe Road ,Longtan District |
| Coordinates | 24.84691, 121.18603 |
| Website | aceredc.com |
Power and grid
| Nearest high-voltage substation | 龍潭超高壓變電所, 345 kV, 3.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 15 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 634 g CO₂ per kWh (Taiwan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.8%, coal 36.1%, solar 5.5%, wind 4.2%, hydro 1.9%. Clean power: 13.5% |
Climate and water
| Average temperature | 21.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.9 °C (2001 to 2025) |
| Cooling degree days | 1,612 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.71 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Acer eDC to the power grid?
The nearest high-voltage substation in OpenStreetMap is 龍潭超高壓變電所 (345 kV), about 3.3 km away.
How clean is the power for Acer eDC?
The grid in Taiwan emits about 634 g CO₂ per kWh (2025). Largest sources: gas 48.8%, coal 36.1%, solar 5.5%.
Who operates Acer eDC?
Acer e-Enabling Data Center.
Data centers near Taoyuan City
- 安碁資訊 542 m · 98 MW
- CHT Zhubei IDC 17.7 km
- NCHC Hsinchu 20.5 km
- Taiwania 2 22.4 km · 1.5 MW
- 中華電信 新北三多測量台 29.0 km
- Ubilink.AI Supercomputer 29.4 km · 1.8 MW
- Data center in New Taipei City 31.1 km · 3 MW
- Data center in New Taipei City 31.6 km · 7.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.