Acesso10 Datacenter Maceio

Acesso10 Datacenter Maceio is an operational data center operated by Acesso10 Datacenter in Maceió, Brazil. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorAcesso10 Datacenter
Networks5 networks, 1 internet exchanges
PeeringDB.
Address61 R. Antenor Marinho de Melo
Coordinates-9.62854, -35.73634
Websiteacesso10.com.br

Power and grid

Nearest high-voltage substationSubestação Rio Largo 2, 230 kV, 17.8 km away (CHESF - Companhia Hidro Elétrica do São Francisco)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature26.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.3 °C (2001 to 2025)
Cooling degree days2,979 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.92 kWh per m² per day
Wind at 50 m6.6 m/s average
Water stress todayLow (<10%) (Alagoas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Acesso10 Datacenter Maceio to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Rio Largo 2 (230 kV), about 17.8 km away.

How clean is the power for Acesso10 Datacenter Maceio?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates Acesso10 Datacenter Maceio?

Acesso10 Datacenter.