Acesso10 Datacenter Maceio
Acesso10 Datacenter Maceio is an operational data center operated by Acesso10 Datacenter in Maceió, Brazil. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Acesso10 Datacenter |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Address | 61 R. Antenor Marinho de Melo |
| Coordinates | -9.62854, -35.73634 |
| Website | acesso10.com.br |
Power and grid
| Nearest high-voltage substation | Subestação Rio Largo 2, 230 kV, 17.8 km away (CHESF - Companhia Hidro Elétrica do São Francisco) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 26.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.3 °C (2001 to 2025) |
| Cooling degree days | 2,979 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.92 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Low (<10%) (Alagoas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Acesso10 Datacenter Maceio to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Rio Largo 2 (230 kV), about 17.8 km away.
How clean is the power for Acesso10 Datacenter Maceio?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Acesso10 Datacenter Maceio?
Acesso10 Datacenter.
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.