AlasConnect Data Center 5

AlasConnect Data Center 5 is an operational data center operated by AlasConnect in Anchorage, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorAlasConnect
Networks1 networks
PeeringDB.
Address3403 Minnesota Dr
Coordinates61.18888, -149.91232
Websitealasconnect.com

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 2.2 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUniversity Substation, 230 kV, 6.4 km away
HV substations within 10 km6
UtilityChugach Electric Assn INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityCEA
Power plants within 50 km824 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity451 g CO₂ per kWh (Alaska, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 39.1%, hydro 29.4%, oil and other fossil 16.2%, coal 12.6%, wind 1.8%. Clean power: 32.2%
Industrial power priceUSD 0.231 per kWh (Alaska, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature1.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature27.1 °C (2001 to 2025)
Cooling degree days2 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.54 kWh per m² per day
Wind at 50 m3.9 m/s average
Water stress todayLow - Medium (10-20%) (Alaska)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is AlasConnect Data Center 5 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 2.2 km away. The local utility is Chugach Electric Assn INC, in the CEA balancing area.

How clean is the power for AlasConnect Data Center 5?

The grid in Alaska emits about 451 g CO₂ per kWh (2025). Largest sources: gas 39.1%, hydro 29.4%, oil and other fossil 16.2%.

Who operates AlasConnect Data Center 5?

AlasConnect.