Data Center Directory

Altia Datacenter

Altia Datacenter is an operational data center operated by Altia in Porriño, Spain. Our footprint estimate of its power is about 8.1 MW.

Key facts

StatusOperational
OperatorAltia
Facility power8.1 MW (range 4 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,722 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates42.16678, -8.69143

Power and grid

Nearest high-voltage substationSubestación Eléctrica de Sárdoma, 132 kV, 5 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestación Atios, 220 kV, 6.6 km away
HV substations within 10 km4
Power plants within 50 km358 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity154 g CO₂ per kWh (Spain, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6%
Industrial power priceEUR 0.105 per kWh (Spain, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature14.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.8 °C (2001 to 2025)
Cooling degree days267 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.08 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayLow - Medium (10-20%) (Galicia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Altia Datacenter use?

We estimate the facility power at about 8.1 MW. Estimate from building footprint, low confidence.

How close is Altia Datacenter to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Eléctrica de Sárdoma (132 kV), about 5 km away.

How clean is the power for Altia Datacenter?

The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.

Who operates Altia Datacenter?

Altia.

Sources

Correct this page or get the data