Amazon AWS Data Center
Amazon AWS Data Center is an operational data center in South Bend, United States. Our footprint estimate of its power is about 118 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 118 MW (range 47 MW to 294 MW) Estimate from building footprint, low confidence. Footprint estimate: about 980,891 m² site outline x 0.12 kW per m² of land. |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 50,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.66776, -86.47306 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 345 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 11 |
| Utility | Indiana Michigan Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Vector Pipeline Co, interstate pipeline, 9.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.0 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 643 g CO₂ per kWh (Indiana, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.7%, gas 36.1%, wind 9.4%, solar 6.5%, oil and other fossil 2.8%. Clean power: 16.4% |
| Industrial power price | USD 0.093 per kWh (Indiana, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.4 °C (2001 to 2025) |
| Cooling degree days | 443 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.81 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Indiana) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon AWS Data Center use?
We estimate the facility power at about 118 MW. Estimate from building footprint, low confidence.
What chips does Amazon AWS Data Center use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How close is Amazon AWS Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (345 kV), about 200 m away. The local utility is Indiana Michigan Power Co, in the PJM balancing area.
How clean is the power for Amazon AWS Data Center?
The grid in Indiana emits about 643 g CO₂ per kWh (2025). Largest sources: coal 44.7%, gas 36.1%, wind 9.4%.
Data centers near South Bend
- Data center in South Bend 2.3 km · 19 MW
- Data center in South Bend 2.3 km · 19 MW
- Project Ranier AWS Data Center 2.5 km · 97 MW
- Data center in South Bend 2.7 km · 19 MW
- Data center in South Bend 2.8 km · 19 MW
- Anthropic-Amazon New Carlisle 5.2 km · 1.2 GW
- Aunalytics South Bend Datacenter (AUSB) 17.9 km
- GAP Union Station 18.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.