Amazon IAD-193

Amazon IAD-193 is an operational data center in Linton Hall, United States. Our footprint estimate of its power is about 21 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
Facility power21 MW (range 10 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,333 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 9,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates38.77713, -77.55617

Power and grid

Nearest high-voltage substationDawkins Branch Substation, 230 kV, 1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km50
UtilityNorthern Virginia Elec Coop (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineDominion Transmission Co, interstate pipeline, 800 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.4 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon IAD-193 use?

We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.

What chips does Amazon IAD-193 use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is Amazon IAD-193 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Dawkins Branch Substation (230 kV), about 1 km away. The local utility is Northern Virginia Elec Coop, in the PJM balancing area.

How clean is the power for Amazon IAD-193?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.