Amazon IAD-193 is an operational data center in Linton Hall, United States. Our footprint estimate of its power is about 21 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,333 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 38.77713, -77.55617 |
Power and grid
| Nearest high-voltage substation | Dawkins Branch Substation, 230 kV, 1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 50 |
| Utility | Northern Virginia Elec Coop (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Dominion Transmission Co, interstate pipeline, 800 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.4 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon IAD-193 use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
What chips does Amazon IAD-193 use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How close is Amazon IAD-193 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Dawkins Branch Substation (230 kV), about 1 km away. The local utility is Northern Virginia Elec Coop, in the PJM balancing area.
How clean is the power for Amazon IAD-193?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Linton Hall
- Amazon IAD-74 153 m · 35 MW
- Iron Mountain Data Center - Manassas (VA-1) 795 m · 40 MW
- Iron Mountain VA-3 971 m · 37 MW
- Amazon IAD-85 1.2 km · 65 MW
- Iron Mountain VA-5 1.4 km · 20 MW
- Iron Mountain VA-7 1.4 km · 33 MW
- Amazon IAD-95 1.5 km · 65 MW
- Amazon Web Services data center in Bull Run 1.7 km · 9.8 MW