Data Center Directory

Apple

Apple is an operational data center operated by Apple in Prineville, United States. Our footprint estimate of its power is about 44 MW.

Key facts

StatusOperational
OperatorApple
Facility power44 MW (range 22 MW to 70 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 36,473 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 19,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates44.28894, -120.87018

Power and grid

UtilityBonneville Power Administration (federal)
Electric retail service territory (HIFLD, US government).
Balancing authorityBPAT
Nearest gas pipelineGas Transmission - Northwest, interstate pipeline, 18.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity200 g CO₂ per kWh (Oregon, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2%
Industrial power priceUSD 0.087 per kWh (Oregon, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayLow - Medium (10-20%) (Oregon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Apple use?

We estimate the facility power at about 44 MW. Estimate from building footprint, low confidence.

How clean is the power for Apple?

The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.

Who operates Apple?

Apple.

Data centers near Prineville

More Apple data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.