Data Center Directory

Applied Digital

Applied Digital is an operational data center in Harwood, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (AMD possible) (guess).

Key facts

StatusOperational
AI chipsNVIDIA GPUs (AMD possible)
Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD.
AddressCounty Rd 81 N 6805, 58042, Harwood
Coordinates46.97417, -96.87394

Power and grid

UtilityCass County Elec Coop INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineViking Gas Transmission Co, interstate pipeline, 12.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity539 g CO₂ per kWh (North Dakota, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 53.3%, wind 36.3%, hydro 5.2%, gas 5.1%. Clean power: 41.5%
Industrial power priceUSD 0.081 per kWh (North Dakota, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature6.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.1 °C (2001 to 2025)
Cooling degree days356 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.84 kWh per m² per day
Wind at 50 m7 m/s average
Water stress todayLow - Medium (10-20%) (North Dakota)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

What chips does Applied Digital use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).

How clean is the power for Applied Digital?

The grid in North Dakota emits about 539 g CO₂ per kWh (2025). Largest sources: coal 53.3%, wind 36.3%, hydro 5.2%.

Data centers near Harwood

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.