Applied Digital
Applied Digital is an operational data center in Harwood, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (AMD possible) (guess).
Key facts
| Status | Operational |
|---|---|
| AI chips | NVIDIA GPUs (AMD possible) Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD. |
| Address | County Rd 81 N 6805, 58042, Harwood |
| Coordinates | 46.97417, -96.87394 |
Power and grid
| Utility | Cass County Elec Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Viking Gas Transmission Co, interstate pipeline, 12.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 539 g CO₂ per kWh (North Dakota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 53.3%, wind 36.3%, hydro 5.2%, gas 5.1%. Clean power: 41.5% |
| Industrial power price | USD 0.081 per kWh (North Dakota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 6.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.1 °C (2001 to 2025) |
| Cooling degree days | 356 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.84 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (North Dakota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Applied Digital use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).
How clean is the power for Applied Digital?
The grid in North Dakota emits about 539 g CO₂ per kWh (2025). Largest sources: coal 53.3%, wind 36.3%, hydro 5.2%.
Data centers near Harwood
- 702 Communications - Fargo, ND 12.6 km
- 702 Communications - Moorhead, MN 13.7 km
- Midco Fargo 15.3 km
- Dakota Carrier Network 17.8 km · 3.7 MW
- DCN Dakota Carrier Networks 18.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.