Armazém Cloud
Armazém Cloud is an operational data center in Joinville, Brazil. Our footprint estimate of its power is about 1.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.1 MW (range 0.6 MW to 1.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 943 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 470 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Joinville |
| Coordinates | -26.23582, -48.88349 |
Power and grid
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Santa Catarina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Armazém Cloud use?
We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.
How clean is the power for Armazém Cloud?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Data centers near Joinville
- Armazém Datacenter - Joinville 547 m
- Neogrid Datacenter Joinville (Brasil TecPar) 4.5 km
- FURB-IX Datacenter 77.0 km
- Oi 83.4 km · 2.2 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.