Arrow Calgary DC1 is an operational data center operated by Arrow Datacenters in Calgary, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Arrow Datacenters |
| Networks | 15 networks, 1 internet exchanges PeeringDB. |
| Address | 330 - 840 7th Ave SW |
| Coordinates | 51.04694, -114.06889 |
| Website | arrowcalgary.ca |
Power and grid
| Utility | Enmax Power Corporation (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 4.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37 °C (2001 to 2025) |
| Cooling degree days | 65 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Medium - High (20-40%) (Alberta) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Arrow Calgary DC1?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Arrow Calgary DC1?
Arrow Datacenters.
Data centers near Calgary
- Equinix CL1 - Calgary 161 m
- Hanover Building Calgary 377 m
- Datahive 785 m
- Cologix CGY1 835 m
- City of Calgary - City Hall 893 m
- Rogers Calgary DC2 (1313 10th Ave SW) 1.7 km · 2.1 MW
- Telus Calgary Internet Data Centre 1.9 km · 10 MW
- Equinix CL2 - Calgary 4.1 km
More Arrow Datacenters data centers
- Arrow Calgary DC2 Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.