Data Center Directory

Aruba IT4 - Rome

Aruba IT4 - Rome is an operational data center operated by Aruba in Rome, Italy. Our footprint estimate of its power is about 6.9 MW.

Key facts

StatusOperational
OperatorAruba
Facility power6.9 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,715 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks17 networks, 3 internet exchanges
PeeringDB.
AddressVia Giacomo Peroni, 380
Coordinates41.93135, 12.63185
Websitedatacenter.it/home.aspx

Power and grid

Grid carbon intensity285 g CO₂ per kWh (Italy, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7%
Industrial power priceEUR 0.173 per kWh (Italy, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature16 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.9 °C (2001 to 2025)
Cooling degree days805 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.25 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayExtremely High (>80%) (Lazio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Aruba IT4 - Rome use?

We estimate the facility power at about 6.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Aruba IT4 - Rome?

The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.

Who operates Aruba IT4 - Rome?

Aruba.

Data centers near Rome

More Aruba data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.