ATE #1
ATE #1 is an operational data center operated by ATE - Avenir Télématique in Villeneuve d'Ascq, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | ATE - Avenir Télématique |
| Address | 21, avenue de la Créativité |
| Coordinates | 50.63997, 3.14598 |
| Website | ate.info |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 225 kV, 2.5 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 1.0 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 67 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.11 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (Hauts-de-France) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is ATE #1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 2.5 km away.
How clean is the power for ATE #1?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates ATE #1?
ATE - Avenir Télématique.
Data centers near Villeneuve d'Ascq
- dc2scale LIL1 (Lille Datacenter) 2.8 km
- Cogent Lille 3.9 km · 1 MW
- Comarch Data Center 4.1 km · 3 MW
- Comarch France #1 4.1 km
- Datacenter SNCF RESARAIL 4.5 km · 7.7 MW
- Lille Boitelle 5.0 km
- Civicos Networking DCROUBAIX 6.0 km
- ETIX Lille #2 6.2 km · 4.4 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.