ATI UEB Aplicaciones de Redes
ATI UEB Aplicaciones de Redes is an operational data center in Sancti Spíritus, Cuba. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.8 MW (range 0.3 MW to 2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,620 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 21.93353, -79.42833 |
Power and grid
| Nearest high-voltage substation | Sancti Spíritus 110 kV, 110 kV, 8.3 km away (UNE – SEN) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Tuinicú 220 kV, 220 kV, 8.7 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 141 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 633 g CO₂ per kWh (Cuba, 2024) Average of all power made in the area. Ember. |
| Grid power mix | oil and other fossil 80.9%, gas 13.4%, solar 2.9%, bioenergy 1.8%, hydro 0.6%. Clean power: 5.7% |
Climate and water
| Average temperature | 25.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 3,005 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.16 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Cuba) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does ATI UEB Aplicaciones de Redes use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is ATI UEB Aplicaciones de Redes to the power grid?
The nearest high-voltage substation in OpenStreetMap is Sancti Spíritus 110 kV (110 kV), about 8.3 km away.
How clean is the power for ATI UEB Aplicaciones de Redes?
The grid in Cuba emits about 633 g CO₂ per kWh (2024). Largest sources: oil and other fossil 80.9%, gas 13.4%, solar 2.9%.
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.