Atlas Powr Williston Datacenter
Atlas Powr Williston Datacenter is an operational data center operated by Atlas Power Holdings (ND) in Williston, United States. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Atlas Power Holdings (ND) |
| Facility power | 13 MW (range 5.1 MW to 32 MW) Estimate from building footprint, low confidence. Footprint estimate: about 106,183 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.14626, -103.77279 |
Power and grid
| Nearest high-voltage substation | Atlas Power Datacenter Substation, 230 kV, 200 m away (Atlas Power Holdings (ND) LLC) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Burke-Divide Electric Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SWPP |
| Nearest gas pipeline | WBI Energy Transmission, interstate pipeline, 7.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.3 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 539 g CO₂ per kWh (North Dakota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 53.3%, wind 36.3%, hydro 5.2%, gas 5.1%. Clean power: 41.5% |
| Industrial power price | USD 0.081 per kWh (North Dakota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 6.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 351 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.93 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (North Dakota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Atlas Powr Williston Datacenter use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is Atlas Powr Williston Datacenter to the power grid?
The nearest high-voltage substation in OpenStreetMap is Atlas Power Datacenter Substation (230 kV), about 200 m away. The local utility is Burke-Divide Electric Coop INC, in the SWPP balancing area.
How clean is the power for Atlas Powr Williston Datacenter?
The grid in North Dakota emits about 539 g CO₂ per kWh (2025). Largest sources: coal 53.3%, wind 36.3%, hydro 5.2%.
Who operates Atlas Powr Williston Datacenter?
Atlas Power Holdings (ND).