اداره مخابرات آذرشهر is an operational data center in Āz̄arshahr, Iran. Our footprint estimate of its power is about 3.4 MW.

Key facts

StatusOperational
Facility power3.4 MW (range 1.7 MW to 5.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,798 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asدفتر ارتباطی ایرانسل
Coordinates37.76161, 45.97650

Power and grid

Grid carbon intensity656 g CO₂ per kWh (Iran, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 73.3%, oil and other fossil 21.3%, hydro 3%, nuclear 1.4%, solar 0.6%. Clean power: 5.2%

Climate and water

Water stress todayExtremely High (>80%) (Iran)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does اداره مخابرات آذرشهر use?

We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.

How clean is the power for اداره مخابرات آذرشهر?

The grid in Iran emits about 656 g CO₂ per kWh (2025). Largest sources: gas 73.3%, oil and other fossil 21.3%, hydro 3%.