Balkan Gate Thessaloniki
Balkan Gate Thessaloniki is an operational data center operated by Lancom in Thessaloniki, Greece. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lancom |
| Networks | 52 networks, 7 internet exchanges PeeringDB. |
| Address | Stadiou |
| Coordinates | 40.65723, 22.86816 |
| Website | balkangate.com |
Power and grid
| Nearest high-voltage substation | Κέντρο Υψηλής Τάσης Ευόσμου, 150 kV, 3.3 km away (Δ.Ε.Η.) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Κέντρο Υπερυψηλής Τάσης Θεσσαλονίκης (ΚΥΤ), 400 kV, 6.1 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 400 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 325 g CO₂ per kWh (Greece, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 40.3%, wind 20.9%, solar 19.7%, oil and other fossil 7.2%, hydro 5.9%. Clean power: 47.7% |
| Industrial power price | EUR 0.143 per kWh (Greece, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.2 °C (2001 to 2025) |
| Cooling degree days | 901 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.29 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Extremely High (>80%) (Greece) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Balkan Gate Thessaloniki to the power grid?
The nearest high-voltage substation in OpenStreetMap is Κέντρο Υψηλής Τάσης Ευόσμου (150 kV), about 3.3 km away.
How clean is the power for Balkan Gate Thessaloniki?
The grid in Greece emits about 325 g CO₂ per kWh (2025). Largest sources: gas 40.3%, wind 20.9%, solar 19.7%.
Who operates Balkan Gate Thessaloniki?
Lancom.
Data centers near Thessaloniki
- Synapsecom SNC-1 Thessaloniki 488 m
- Lancom Thessaloniki DC 6.9 km
More Lancom data centers
- Lancom Athens DC Greece
- Lancom Thessaloniki DC Greece
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.