Batelco Hamala Data Center

Batelco Hamala Data Center is an operational data center operated by Batelco in Madīnat Ḩamad, Bahrain. Our footprint estimate of its power is about 5.6 MW.

Key facts

StatusOperational
OperatorBatelco
Facility power5.6 MW (range 2.8 MW to 9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,678 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates26.15646, 50.47474
Websitebatelco.com/business/data-center

Power and grid

Nearest high-voltage substation220 kV Al-Jasra substation, 220 kV, 1.2 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
Power plants within 50 km15 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity902 g CO₂ per kWh (Bahrain, 2024)
Average of all power made in the area. Ember.
Grid power mixgas 99.7%. Clean power: 0.3%

Climate and water

Average temperature27.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.1 °C (2001 to 2025)
Cooling degree days3,351 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.25 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayExtremely High (>80%) (Northern)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Batelco Hamala Data Center use?

We estimate the facility power at about 5.6 MW. Estimate from building footprint, low confidence.

How close is Batelco Hamala Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is 220 kV Al-Jasra substation (220 kV), about 1.2 km away.

How clean is the power for Batelco Hamala Data Center?

The grid in Bahrain emits about 902 g CO₂ per kWh (2024). Largest sources: gas 99.7%.

Who operates Batelco Hamala Data Center?

Batelco.