Batelco Hamala Data Center
Batelco Hamala Data Center is an operational data center operated by Batelco in Madīnat Ḩamad, Bahrain. Our footprint estimate of its power is about 5.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Batelco |
| Facility power | 5.6 MW (range 2.8 MW to 9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,678 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 26.15646, 50.47474 |
| Website | batelco.com/business/data-center |
Power and grid
| Nearest high-voltage substation | 220 kV Al-Jasra substation, 220 kV, 1.2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 15 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 902 g CO₂ per kWh (Bahrain, 2024) Average of all power made in the area. Ember. |
| Grid power mix | gas 99.7%. Clean power: 0.3% |
Climate and water
| Average temperature | 27.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.1 °C (2001 to 2025) |
| Cooling degree days | 3,351 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.25 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Extremely High (>80%) (Northern) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Batelco Hamala Data Center use?
We estimate the facility power at about 5.6 MW. Estimate from building footprint, low confidence.
How close is Batelco Hamala Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is 220 kV Al-Jasra substation (220 kV), about 1.2 km away.
How clean is the power for Batelco Hamala Data Center?
The grid in Bahrain emits about 902 g CO₂ per kWh (2024). Largest sources: gas 99.7%.
Who operates Batelco Hamala Data Center?
Batelco.
Data centers near Madīnat Ḩamad
- Amazon Web Services 227 m · 17 MW
- BIX-SEEF-POP 11.0 km
- Zain Bahrain 11.1 km
- stc Bahrain 11.3 km
- Amazon Web Services 12.1 km · 11 MW
- Amazon Web Services 16.2 km · 15 MW
- Global Zone 16.9 km
- Nuetel Communications Datacenter 24.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.