Bluebird Quad Cities Data Center
Bluebird Quad Cities Data Center is an operational data center operated by Bluebird Fiber in Bettendorf, United States. Our footprint estimate of its power is about 4.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bluebird Fiber |
| Facility power | 4.6 MW (range 2.3 MW to 7.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,870 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 8 networks, 1 internet exchanges PeeringDB. |
| Also known as | Geneseo Communications Inc |
| Address | 2701 Devils Glen Rd |
| Coordinates | 41.55032, -90.48246 |
| Website | bluebirdnetwork.com/quad-cities-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 161 kV, 2 km away (MidAmerican Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sub 39, 345 kV, 11.1 km away |
| HV substations within 10 km | 9 |
| Utility | Eastern Iowa Light & Power Coop (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Border PL Co, interstate pipeline, 7.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 552 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.99 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bluebird Quad Cities Data Center use?
We estimate the facility power at about 4.6 MW. Estimate from building footprint, low confidence.
How close is Bluebird Quad Cities Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 2 km away. The local utility is Eastern Iowa Light & Power Coop, in the MISO balancing area.
How clean is the power for Bluebird Quad Cities Data Center?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates Bluebird Quad Cities Data Center?
Bluebird Fiber.
Data centers near Bettendorf
- SFN IA-Davenport 11.5 km
More Bluebird Fiber data centers
- Bluebird Underground Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.