Cabase JUJ

Cabase JUJ is an operational data center operated by Cámara Argentina de Internet (CABASE) in San Salvador de Jujuy, Argentina. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorCámara Argentina de Internet (CABASE)
Networks9 networks, 1 internet exchanges
PeeringDB.
AddressAv.Bolivia 1239, R8400
Coordinates-24.17922, -65.32465
Websiteixp.cabase.org.ar

Power and grid

Nearest high-voltage substationEstación Transformadora Palpalá, 132 kV, 16.5 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationEstación Transformadora San Juancito 500, 500 kV, 39.8 km away
Power plants within 50 km8 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity345 g CO₂ per kWh (Argentina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41%

Climate and water

Average temperature8.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature27.4 °C (2001 to 2025)
Cooling degree days0 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy6.23 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayMedium - High (20-40%) (Jujuy)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is Cabase JUJ to the power grid?

The nearest high-voltage substation in OpenStreetMap is Estación Transformadora Palpalá (132 kV), about 16.5 km away.

How clean is the power for Cabase JUJ?

The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.

Who operates Cabase JUJ?

Cámara Argentina de Internet (CABASE).

Data centers near San Salvador de Jujuy

More Cámara Argentina de Internet (CABASE) data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.