Data Center Directory

Carfax

Carfax is an operational data center in Columbia, United States. Our footprint estimate of its power is about 4.5 MW.

Key facts

StatusOperational
Facility power4.5 MW (range 2.2 MW to 7.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,712 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates38.92352, -92.28861

Power and grid

UtilityCity Of Columbia (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineSouthern Star Central Gas PL Co, interstate pipeline, 7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity674 g CO₂ per kWh (Missouri, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 63.1%, gas 13%, nuclear 9.8%, wind 8.9%, solar 3.3%. Clean power: 23.7%
Industrial power priceUSD 0.099 per kWh (Missouri, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayLow - Medium (10-20%) (Missouri)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Carfax use?

We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.

How clean is the power for Carfax?

The grid in Missouri emits about 674 g CO₂ per kWh (2025). Largest sources: coal 63.1%, gas 13%, nuclear 9.8%.

Sources

Correct this page or get the data