Centro de Datos - CNT
Centro de Datos - CNT is an operational data center in Santa Lucía, Ecuador. Our footprint estimate of its power is about 8.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 8.4 MW (range 4.2 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,011 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -2.19931, -80.08540 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 4.5 km away (Generoca) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestación Electrica Nueva Prosperina, 230 kV, 13.6 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 403 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 158 g CO₂ per kWh (Ecuador, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 77.6%, oil and other fossil 17.9%, gas 2.6%, bioenergy 0.8%, solar 0.5%. Clean power: 79.5% |
Climate and water
| Average temperature | 27.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 3,777 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.85 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low (<10%) (Guayas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de Datos - CNT use?
We estimate the facility power at about 8.4 MW. Estimate from building footprint, low confidence.
How close is Centro de Datos - CNT to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 4.5 km away.
How clean is the power for Centro de Datos - CNT?
The grid in Ecuador emits about 158 g CO₂ per kWh (2025). Largest sources: hydro 77.6%, oil and other fossil 17.9%, gas 2.6%.
Data centers near Santa Lucía
- Telconet Cloudcenter Guayaquil 15.6 km
- CNT - Nodo Bastión CTG 20.1 km
- Gamavisión 22.2 km · 2.3 MW
- TC Television 22.4 km · 5.8 MW
- Ufinet Ciudad Digital Data Center 22.7 km
- Telxius Salinas DC 96.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.