Centro de datos KIO MEX1
Centro de datos KIO MEX1 is an operational data center in Delegación Cuajimalpa de Morelos, Mexico. Our footprint estimate of its power is about 1.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.1 MW (range 0.5 MW to 2.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,468 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 470 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 19.36362, -99.27683 |
Power and grid
| Nearest high-voltage substation | El Insurgente SET2, 230 kV, 3.1 km away (CFE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 14 |
| Power plants within 50 km | 1.8 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 13.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.7 °C (2001 to 2025) |
| Cooling degree days | 26 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.51 kWh per m² per day |
| Wind at 50 m | 3 m/s average |
| Water stress today | High (40-80%) (Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos KIO MEX1 use?
We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.
How close is Centro de datos KIO MEX1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is El Insurgente SET2 (230 kV), about 3.1 km away.
How clean is the power for Centro de datos KIO MEX1?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Data centers near Delegación Cuajimalpa de Morelos
- Centro de datos KIO MEX2 359 m · 0.6 MW
- MTP Sites Mexico City Santa Fe DC 424 m
- Maxcom 1.7 km
- KIO México 3 (MEX3) 2.0 km
- KIO México 2 (MEX2) 2.8 km
- KIO México 4 (MEX4) 4.1 km · 0.7 MW
- ATC Edge CDMX/E1 10.5 km
- Triara Mexico City 15.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.