Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL is an operational data center operated by CDL in Campos dos Goytacazes, Brazil. Our footprint estimate of its power is about 0.6 MW.

Key facts

StatusOperational
OperatorCDL
Facility power0.6 MW (range 0.3 MW to 1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 536 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 260 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-21.75834, -41.31759
Websitecdlcampos.org.br

Power and grid

Nearest high-voltage substationSubestação Campos dos Goytacazes, 138 kV, 1.7 km away (Enel Distribuição Rio)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestação Campos, 345 kV, 4.8 km away
HV substations within 10 km5
Power plants within 50 km1.4 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature24.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37 °C (2001 to 2025)
Cooling degree days2,336 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.97 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow (<10%) (Rio de Janeiro)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL use?

We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.

How close is Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Campos dos Goytacazes (138 kV), about 1.7 km away.

How clean is the power for Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL?

CDL.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.