Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL
Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL is an operational data center operated by CDL in Campos dos Goytacazes, Brazil. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CDL |
| Facility power | 0.6 MW (range 0.3 MW to 1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 536 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -21.75834, -41.31759 |
| Website | cdlcampos.org.br |
Power and grid
| Nearest high-voltage substation | Subestação Campos dos Goytacazes, 138 kV, 1.7 km away (Enel Distribuição Rio) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestação Campos, 345 kV, 4.8 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 1.4 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 24.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37 °C (2001 to 2025) |
| Cooling degree days | 2,336 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.97 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low (<10%) (Rio de Janeiro) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
How close is Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Campos dos Goytacazes (138 kV), about 1.7 km away.
How clean is the power for Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Centro de Dirigentes Lojistas de Campos dos Goytacazes - CDL?
CDL.