Centro de Entrenamiento Tecnológico is an operational data center operated by UNMSM - Huawei in Carmen De La Legua Reynoso, Peru. No power figure is public for this site yet. Likely chips: Huawei Ascend and NVIDIA China-market GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | UNMSM - Huawei |
| AI chips | Huawei Ascend and NVIDIA China-market GPUs Guess from the operator, not confirmed. Chinese operators use Huawei Ascend and export-limited NVIDIA chips. |
| Coordinates | -12.05297, -77.08547 |
Power and grid
| Nearest high-voltage substation | Subestación Barsi, 220 kV, 2.1 km away (Enel distribución Perú) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.1 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 235 g CO₂ per kWh (Peru, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 55.2%, gas 35.6%, solar 4.4%, wind 3.5%, bioenergy 1.1%. Clean power: 64.1% |
Climate and water
| Average temperature | 18.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 27.3 °C (2001 to 2025) |
| Cooling degree days | 307 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.35 kWh per m² per day |
| Wind at 50 m | 3.4 m/s average |
| Water stress today | Extremely High (>80%) (Callao) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Centro de Entrenamiento Tecnológico use?
No chips are reported. Based on the operator, the likely chips are Huawei Ascend and NVIDIA China-market GPUs.
How close is Centro de Entrenamiento Tecnológico to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Barsi (220 kV), about 2.1 km away.
How clean is the power for Centro de Entrenamiento Tecnológico?
The grid in Peru emits about 235 g CO₂ per kWh (2025). Largest sources: hydro 55.2%, gas 35.6%, solar 4.4%.
Who operates Centro de Entrenamiento Tecnológico?
UNMSM - Huawei.
Data centers near Carmen De La Legua Reynoso
- Centro de Datos Win Santa Catalina 8.2 km
- IPTP, San Isidro, Lima, Peru 8.7 km
- WIN Empresas 8.8 km
- Internexa Lima Surco 12.8 km
- Telefónica Data Center (TIC Monterrico) Peru 12.8 km
- EdgeUno Datacenter Lima Peru (LIM1) 12.8 km
- Cirion Lima - LIM1 13.0 km
- GTD Peru Data Center 14.2 km