Data Center Directory

Centrum Przetwarzania Danych T‑Mobile Polska

Centrum Przetwarzania Danych T‑Mobile Polska is an operational data center operated by T‑Mobile Polska in Piaseczno, Poland. Our footprint estimate of its power is about 9.3 MW.

Key facts

StatusOperational
OperatorT‑Mobile Polska
Facility power9.3 MW (range 4.7 MW to 15 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,770 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates52.07874, 21.00602

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna "ZKK" 110kV, 110 kV, 2.3 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 220/110kV „SE Piaseczno”, 220 kV, 2.4 km away
HV substations within 10 km9
Power plants within 50 km1.5 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.9 °C (2001 to 2025)
Cooling degree days200 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centrum Przetwarzania Danych T‑Mobile Polska use?

We estimate the facility power at about 9.3 MW. Estimate from building footprint, low confidence.

How close is Centrum Przetwarzania Danych T‑Mobile Polska to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna "ZKK" 110kV (110 kV), about 2.3 km away.

How clean is the power for Centrum Przetwarzania Danych T‑Mobile Polska?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates Centrum Przetwarzania Danych T‑Mobile Polska?

T‑Mobile Polska.