Cloud Center Andalucía is an operational data center in Maracena, Spain. Our footprint estimate of its power is about 3.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.9 MW (range 2 MW to 6.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,633 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Calle Pago de Cambea |
| Coordinates | 37.20076, -3.65699 |
Power and grid
| Nearest high-voltage substation | Subestación de Atarfe, 220 kV, 4.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 124 MW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 798 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.06 kWh per m² per day |
| Wind at 50 m | 4.2 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cloud Center Andalucía use?
We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.
How close is Cloud Center Andalucía to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación de Atarfe (220 kV), about 4.5 km away.
How clean is the power for Cloud Center Andalucía?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Data centers near Maracena
- inforland.com 54.0 km
- Templus DC Málaga MAL01 91.9 km
- ODC Malaga 93.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.