Cometa Internet is an operational data center operated by Maila Networks in Porto Alegre, Brazil. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Maila Networks |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| Networks | 1 networks PeeringDB. |
| Address | R. Gomes de Freitas 340, Jardim Itu |
| Coordinates | -30.01310, -51.14302 |
| Website | cometa.net.br |
Power and grid
| Nearest high-voltage substation | Subestação Porto Alegre 8, 230 kV, 500 m away (CEEE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 60 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 19.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.4 °C (2001 to 2025) |
| Cooling degree days | 1,009 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.48 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Rio Grande do Sul) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Cometa Internet use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is Cometa Internet to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Porto Alegre 8 (230 kV), about 500 m away.
How clean is the power for Cometa Internet?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Cometa Internet?
Maila Networks.
Data centers near Porto Alegre
- PIX-Tri Telecom 3.7 km
- PIX Nossa Telecom PAE 4.1 km
- Cirion Porto Alegre 4.1 km
- Adylnet Telecom - Porto Alegre 4.6 km
- Elea POA1 - Porto Alegre 5.2 km
- Scala Data Centers SPOAPA01 5.4 km
- PIX Defferrari - Porto Alegre 6.2 km
- PIX NexFibra 6.5 km
More Maila Networks data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.