Compass Data Center
Compass Data Center is an operational data center in Red Oak, United States. Our footprint estimate of its power is about 39 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 39 MW (range 19 MW to 62 MW) Estimate from building footprint, low confidence. Footprint estimate: about 32,416 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 17,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 32.54419, -96.80219 |
Power and grid
| Utility | Hilco Electric Cooperative, INC. (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 4.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 1,598 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.71 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Compass Data Center use?
We estimate the facility power at about 39 MW. Estimate from building footprint, low confidence.
How clean is the power for Compass Data Center?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Red Oak
- Compass Data Center 289 m · 39 MW
- Compass Data Center 640 m · 5 MW
- Compass Data Center 800 m · 39 MW
- Compass Data Center 812 m · 39 MW
- Google Red Oak 894 m · 93 MW
- Google 1.0 km · 27 MW
- Compass Data Center 1.3 km · 39 MW
- Data center in Lancaster 7.6 km · 63 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.