Compute North
Compute North is an operational data center in Kearney, United States. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3 MW (range 1.2 MW to 7.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,175 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.72593, -99.03834 |
Power and grid
| Utility | Dawson Power District (political subdivision) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SWPP |
| Nearest gas pipeline | Trailblazer Pipeline Co, interstate pipeline, 18 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 460 g CO₂ per kWh (Nebraska, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 46%, wind 29.4%, nuclear 17.4%, gas 3.2%, hydro 2.9%. Clean power: 50.7% |
| Industrial power price | USD 0.084 per kWh (Nebraska, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Extremely High (>80%) (Nebraska) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Compute North use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
How clean is the power for Compute North?
The grid in Nebraska emits about 460 g CO₂ per kWh (2025). Largest sources: coal 46%, wind 29.4%, nuclear 17.4%.