Compute North is an operational data center in Kearney, United States. Our footprint estimate of its power is about 3 MW.

Key facts

StatusOperational
Facility power3 MW (range 1.2 MW to 7.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 25,175 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.72593, -99.03834

Power and grid

UtilityDawson Power District (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authoritySWPP
Nearest gas pipelineTrailblazer Pipeline Co, interstate pipeline, 18 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity460 g CO₂ per kWh (Nebraska, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 46%, wind 29.4%, nuclear 17.4%, gas 3.2%, hydro 2.9%. Clean power: 50.7%
Industrial power priceUSD 0.084 per kWh (Nebraska, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayExtremely High (>80%) (Nebraska)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Compute North use?

We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.

How clean is the power for Compute North?

The grid in Nebraska emits about 460 g CO₂ per kWh (2025). Largest sources: coal 46%, wind 29.4%, nuclear 17.4%.

Sources