Core42 Lake Mariner

Core42 Lake Mariner is an operational AI data center operated by Core42 in Barker, United States. Its power is about 58 MW. Epoch AI estimates about 72,000 H100-equivalent AI chips (B200).

Key facts

StatusOperational
OperatorCore42
UsersG42 (likely)
Facility power58 MW
Reported (Epoch AI or owner data)
IT power58 MW
AI compute72,000 H100-equivalents
AI chipsB200
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 32,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 2.2 billion
Epoch AI estimate, 2025 USD.
InvestorsGoogle
Address7725 Lake Rd, Barker, NY 14012
Coordinates43.35865, -78.60413

Power and grid

Nearest high-voltage substationSomerset Substation, 345 kV, 800 m away (NYSEG)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
UtilityNiagara Mohawk Power Corp. (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityNYIS
Nearest gas pipelineNational Fuel Gas Distr Co, intrastate pipeline, 24 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.2 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity268 g CO₂ per kWh (New York, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9%
Industrial power priceUSD 0.105 per kWh (New York, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30 °C (2001 to 2025)
Cooling degree days246 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.59 kWh per m² per day
Wind at 50 m7.4 m/s average
Water stress todayLow - Medium (10-20%) (New York)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-10-0100Land clearing begins for Building 1, also known as CB-1, the first large AI/HPC building on the site.
2025-10-0119 MW20,000Building 1 is operational. Based on Terawulf [saying](https://investors.terawulf.com/news-events/press-releases/detail/126/terawulf-reports-third-quarter-2025-results) "As of September 30, 2025, the site has energized 245 MW of Bitcoin-mining capacity and 22.5 MW of HPC capacity." The small "Wulf Den" building was [said](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to be 2 MW of IT power while CB-1 would be 16 MW. This is roughly consistent with 22.5 MW of total facility power. This building is [leased](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.
2026-03-0219 MW20,000Buildings 1 and 2 both appear to have complete building and cooling equipment, based on satellite imagery. Not considering Building 2 operational yet, due to Terawulf's [statement](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB2B is expected in March 2026, and is likely still in commissioning phase.
2026-03-3158 MW72,000Building 2 is operational. On February 26, Terawulf [stated](https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results) that CB2A is operational, presumably making up half the final capacity. CB2B was expected in March 2026. However, it's notable that a drone video commissioned from [RAAD](https://raad.com/) showed no cooling fan movement on May 8th, suggesting it was not in use. This building is [leased](https://investors.terawulf.com/news-events/press-releases/detail/99/terawulf-to-deliver-over-70-mw-of-data-center) to Core42, a subsidiary of UAE-based G42. It likely uses NVIDIA DGX B200 servers.
2026-07-2358 MW72,000Both buildings still operational according to satellite imagery.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-10-01B2007,852Estimate
2026-03-31B20028,463Estimate

Satellite view

Questions

How much power does Core42 Lake Mariner use?

Public data puts the facility power at about 58 MW. Reported (Epoch AI or owner data).

What chips does Core42 Lake Mariner use?

Reported chips: B200.

How close is Core42 Lake Mariner to the power grid?

The nearest high-voltage substation in OpenStreetMap is Somerset Substation (345 kV), about 800 m away. The local utility is Niagara Mohawk Power Corp., in the NYIS balancing area.

How clean is the power for Core42 Lake Mariner?

The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.

Who operates Core42 Lake Mariner?

Core42. Reported users: G42.