CPD Gobierno de Navarra
CPD Gobierno de Navarra is an operational data center operated by Nasertic in Pamplona, Spain. Our footprint estimate of its power is about 1.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Nasertic |
| Facility power | 1.7 MW (range 0.9 MW to 2.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,424 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 730 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.81779, -1.65969 |
Power and grid
| Nearest high-voltage substation | Subestación electrica Cordovilla, 220 kV, 4.1 km away (Red Eléctrica de España;Iberdrola) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 293 MW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 185 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.72 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CPD Gobierno de Navarra use?
We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.
How close is CPD Gobierno de Navarra to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación electrica Cordovilla (220 kV), about 4.1 km away.
How clean is the power for CPD Gobierno de Navarra?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates CPD Gobierno de Navarra?
Nasertic.
Data centers near Pamplona
- CPD Gobierno de Navarra 2.9 km
- Ibercom San Sebastian 60.3 km
- IzarHost 70.5 km
More Nasertic data centers
- CPD Gobierno de Navarra Spain