CtrlS Mumbai DC1

CtrlS Mumbai DC1 is an operational data center operated by CtrlS Datacenters in Mumbai, India. Our footprint estimate of its power is about 1.5 MW.

Key facts

StatusOperational
OperatorCtrlS Datacenters
Facility power1.5 MW (range 0.6 MW to 3.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 12,246 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 640 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks61 networks, 3 internet exchanges
PeeringDB.
Also known asCtrlS Mumbai DC2 · CtrlS Mumbai
AddressPlot No. GEN 72/1/A, TTC Industrial Area, South Central Road, MIDC Industrial Area,, Mahape
Coordinates19.10821, 73.02359
Websitectrls.in

Power and grid

Grid carbon intensity666 g CO₂ per kWh (India, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1%

Climate and water

Average temperature26.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.9 °C (2001 to 2025)
Cooling degree days3,369 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.16 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayExtremely High (>80%) (Maharashtra)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CtrlS Mumbai DC1 use?

We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.

How clean is the power for CtrlS Mumbai DC1?

The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.

Who operates CtrlS Mumbai DC1?

CtrlS Datacenters.