Data center in Albuquerque is an operational data center in Albuquerque, United States. Our footprint estimate of its power is about 3.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.9 MW (range 2 MW to 6.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,290 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | M Street Southeast |
| Coordinates | 35.04835, -106.54215 |
Power and grid
| Utility | Public Service Co Of Nm (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PNM |
| Nearest gas pipeline | Public Service Co of NM, intrastate pipeline, 13.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 347 g CO₂ per kWh (New Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 35.7%, gas 26.4%, coal 20.5%, solar 17.4%. Clean power: 53.3% |
| Industrial power price | USD 0.051 per kWh (New Mexico, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 491 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.53 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Extremely High (>80%) (New Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Albuquerque use?
We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Albuquerque?
The grid in New Mexico emits about 347 g CO₂ per kWh (2025). Largest sources: wind 35.7%, gas 26.4%, coal 20.5%.
Data centers near Albuquerque
- HPC 187 m · 16 MW
- Southwest Cyberport Albuquerque 7.4 km
- UNM Data Center 7.9 km
- UNMH data center in Albuquerque 8.4 km
- Molina Healthcare 9.1 km · 4 MW
- bigbyte.cc 10.5 km
- ServerCondo-219 Albuquerque 10.6 km