Data Center Directory

Data center in Badaling

Data center in Badaling is an operational data center in Badaling, China. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
Facility power11 MW (range 5.6 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,324 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.48450, 115.55872

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 300 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 220 kV, 5.5 km away
HV substations within 10 km2
Power plants within 50 km661 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity528 g CO₂ per kWh (China, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1%

Climate and water

Average temperature6.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.1 °C (2001 to 2025)
Cooling degree days325 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.32 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayExtremely High (>80%) (Beijing)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Badaling use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is Data center in Badaling to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 300 m away.

How clean is the power for Data center in Badaling?

The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.

Data centers near Badaling

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.