Data center in Bucaramanga

Data center in Bucaramanga is an operational data center in Bucaramanga, Colombia. Our footprint estimate of its power is about 0.5 MW.

Key facts

StatusOperational
Facility power0.5 MW (range 0.3 MW to 0.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 430 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 210 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates7.09576, -73.12688

Power and grid

Nearest high-voltage substationSubestación Eléctrica Real de Minas, 115 kV, 100 m away (ESSA)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubestación Eléctrica Palenque, 230 kV, 4.2 km away
HV substations within 10 km8
Power plants within 50 km819 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity185 g CO₂ per kWh (Colombia, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 68.5%, gas 13%, solar 5.9%, coal 5.5%, oil and other fossil 4.3%. Clean power: 77.1%

Climate and water

Average temperature20.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.9 °C (2001 to 2025)
Cooling degree days949 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.3 kWh per m² per day
Wind at 50 m1.9 m/s average
Water stress todayLow (<10%) (Colombia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Bucaramanga use?

We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.

How close is Data center in Bucaramanga to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Eléctrica Real de Minas (115 kV), about 100 m away.

How clean is the power for Data center in Bucaramanga?

The grid in Colombia emits about 185 g CO₂ per kWh (2025). Largest sources: hydro 68.5%, gas 13%, solar 5.9%.

Sources

Correct this page or get the data