Data center in Catamarca
Data center in Catamarca is an operational data center in Catamarca, Argentina. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Also known as | Pabellon 4 |
| Coordinates | -28.45956, -65.76587 |
Power and grid
| Nearest high-voltage substation | Estación Transformadora El Pantanillo, 132 kV, 9.3 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 8 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 345 g CO₂ per kWh (Argentina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 55.9%, hydro 16.2%, wind 12.1%, nuclear 7%, solar 3.6%. Clean power: 41% |
Climate and water
| Average temperature | 16.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.6 °C (2001 to 2025) |
| Cooling degree days | 702 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.18 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | High (40-80%) (Catamarca) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Data center in Catamarca to the power grid?
The nearest high-voltage substation in OpenStreetMap is Estación Transformadora El Pantanillo (132 kV), about 9.3 km away.
How clean is the power for Data center in Catamarca?
The grid in Argentina emits about 345 g CO₂ per kWh (2025). Largest sources: gas 55.9%, hydro 16.2%, wind 12.1%.
Data centers near Catamarca
- Shelter Modernización 186 m
- Data center in Catamarca 276 m
- Rack Modernización 1.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.