Data center in Datong is an operational data center in Datong, China. Our footprint estimate of its power is about 38 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 38 MW (range 15 MW to 96 MW) Estimate from building footprint, low confidence. Footprint estimate: about 319,387 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.29695, 113.75138 |
Power and grid
| Grid carbon intensity | 528 g CO₂ per kWh (China, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1% |
Climate and water
| Water stress today | High (40-80%) (Shanxi) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Datong use?
We estimate the facility power at about 38 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Datong?
The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.
Data centers near Datong
- Data center in Ulanqab 84.1 km
- Data center in Ulanqab 84.1 km · 9.8 MW
- Data center in Ulanqab 84.2 km
- Data center in Ulanqab 84.4 km · 25 MW
- Data center in Ulanqab 84.4 km · 12 MW
- Data center in Ulanqab 84.5 km · 39 MW
- Data center in Ulanqab 84.6 km · 23 MW
- Data center in Ulanqab 84.6 km · 20 MW