Data center in Fontenay-sous-Bois

Data center in Fontenay-sous-Bois is an operational data center in Fontenay-sous-Bois, France. Our footprint estimate of its power is about 2.8 MW.

Key facts

StatusOperational
Facility power2.8 MW (range 1.4 MW to 4.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,359 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates48.85663, 2.49264

Power and grid

Nearest high-voltage substationPoste électrique Alouettes, 225 kV, 200 m away (Enedis)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km35
Power plants within 50 km2.2 GW in 55 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days130 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.19 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Fontenay-sous-Bois use?

We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.

How close is Data center in Fontenay-sous-Bois to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique Alouettes (225 kV), about 200 m away.

How clean is the power for Data center in Fontenay-sous-Bois?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.