Data center in Gütersloh
Data center in Gütersloh is an operational data center in Gütersloh, Germany. Our footprint estimate of its power is about 2.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.2 MW (range 1.1 MW to 3.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,822 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 940 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.88395, 8.44753 |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 93 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.85 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Gütersloh use?
We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Gütersloh?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Gütersloh
- BITel Gütersloh 5.3 km
- BITel Bielefeld 16.0 km
- euNetworks Colocation Bielefeld 16.5 km
- BICOS COMPUTER GmbH 16.8 km
- YEXIO 26.4 km · 3.5 MW
- DTS DataCenter Herford 29.6 km
- VegaSystems Datacenter Paderborn 30.0 km
- Data center in Paderborn 30.1 km · 0.7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.