Data center in Hrodna
Data center in Hrodna is an operational data center in Hrodna, Belarus. Our footprint estimate of its power is about 2.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.9 MW (range 1.4 MW to 4.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,197 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | вуліца Карскага 12 |
| Coordinates | 53.68340, 23.88216 |
Power and grid
| Grid carbon intensity | 314 g CO₂ per kWh (Belarus, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 56%, nuclear 37.3%, oil and other fossil 3.7%, bioenergy 1.2%, hydro 0.7%. Clean power: 40.3% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Belarus) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Hrodna use?
We estimate the facility power at about 2.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Hrodna?
The grid in Belarus emits about 314 g CO₂ per kWh (2025). Largest sources: gas 56%, nuclear 37.3%, oil and other fossil 3.7%.
Data centers near Hrodna
- Orange Polska // Białystok 77.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.