Data center in Jülich
Data center in Jülich is an operational data center in Jülich, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Address | Königskamp 32, 52428, Jülich |
| Coordinates | 50.91484, 6.38482 |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.6 °C (2001 to 2025) |
| Cooling degree days | 131 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.96 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Data center in Jülich?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Jülich
- "Jupiter, Jülich" 2.0 km · 18 MW
- SOCO Datacenter 10.8 km
- SkyLink Data Center BV 22.2 km
- RelAix Networks hex/AC 22.8 km
- EURaix Evolution 23.2 km · 2.9 MW
- EURaix 23.5 km · 2.2 MW
- Euregiocenter 26.9 km · 1.6 MW
- Data center in Aachen 28.7 km · 0.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.