Data center in Karoliniškės

Data center in Karoliniškės is an operational data center in Karoliniškės, Lithuania. Our footprint estimate of its power is about 2.1 MW.

Key facts

StatusOperational
Facility power2.1 MW (range 1 MW to 3.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,717 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates54.68725, 25.21609

Power and grid

Grid carbon intensity138 g CO₂ per kWh (Lithuania, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 45%, solar 18.7%, gas 16.4%, bioenergy 10.2%, oil and other fossil 5.9%. Clean power: 77.7%
Industrial power priceEUR 0.112 per kWh (Lithuania, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature6.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.1 °C (2001 to 2025)
Cooling degree days88 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.86 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayMedium - High (20-40%) (Lithuania)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Karoliniškės use?

We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Karoliniškės?

The grid in Lithuania emits about 138 g CO₂ per kWh (2025). Largest sources: wind 45%, solar 18.7%, gas 16.4%.