Data center in Kudrovo is an operational data center in Kudrovo, Russia. Our footprint estimate of its power is about 18 MW.

Key facts

StatusOperational
Facility power18 MW (range 9.2 MW to 29 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 15,350 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asДата-центр "Вконтакте"
Coordinates59.91161, 30.57763

Power and grid

Grid carbon intensity447 g CO₂ per kWh (Russia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7%

Climate and water

Average temperature4.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.4 °C (2001 to 2025)
Cooling degree days57 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.57 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow - Medium (10-20%) (Russia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Kudrovo use?

We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Kudrovo?

The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.