Data Center Directory

Data center in Luoyang

Data center in Luoyang is an operational data center in Luoyang, China. Our footprint estimate of its power is about 5.2 MW.

Key facts

StatusOperational
Facility power5.2 MW (range 2.6 MW to 8.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,298 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates34.63287, 112.50124

Power and grid

Grid carbon intensity528 g CO₂ per kWh (China, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1%

Climate and water

Water stress todayExtremely High (>80%) (Henan)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Luoyang use?

We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Luoyang?

The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.