Data center in Manassas
Data center in Manassas is an operational data center in Manassas, United States. Our footprint estimate of its power is about 28 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 28 MW (range 14 MW to 46 MW) Estimate from building footprint, low confidence. Footprint estimate: about 23,734 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Infantry Ridge Road 7777, 20109, Manassas |
| Coordinates | 38.80485, -77.51241 |
Power and grid
| Utility | Northern Virginia Elec Coop (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 400 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Manassas use?
We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Manassas?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Manassas
- Equinix DC14 229 m · 3.2 MW
- Amazon IAD-7 2.7 km · 13 MW
- Amazon IAD-11 3.0 km · 10 MW
- Amazon Web Services data center in Bull Run 3.5 km · 9.8 MW
- Amazon IAD-95 3.8 km · 65 MW
- Amazon IAD-85 3.9 km · 65 MW
- Iron Mountain VA-7 4.1 km · 33 MW
- Iron Mountain Data Center - Manassas (VA-1) 4.2 km · 40 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.