Data center in Mariendorf
Data center in Mariendorf is a data center under construction in Mariendorf, Germany. Our footprint estimate of its power is about 3.4 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 3.4 MW (range 1.4 MW to 8.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,529 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 52.43960, 13.37328 |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 209 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.83 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Mariendorf use?
We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Mariendorf?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Mariendorf
- NTT 152 m · 13 MW
- NTT Berlin 2 Data Center (BER2) 224 m
- Virtus 643 m · 7.3 MW
- Lumen Berlin 771 m
- Vodafone data center in Mariendorf 1.3 km
- 3U Rechenzentrum Berlin 2.1 km
- Speedbone Berlin 2.9 km · 0.9 MW
- NorthC Berlin 4.0 km · 4.4 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.