Data center in Mariendorf

Data center in Mariendorf is a data center under construction in Mariendorf, Germany. Our footprint estimate of its power is about 3.4 MW.

Key facts

StatusUnder construction
Facility power3.4 MW (range 1.4 MW to 8.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 28,529 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates52.43960, 13.37328

Power and grid

Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days209 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.83 kWh per m² per day
Wind at 50 m6.6 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Mariendorf use?

We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Mariendorf?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.