Data Center Directory

Data center in Mikkeli

Data center in Mikkeli is a data center under construction in Mikkeli, Finland. Our footprint estimate of its power is about 16 MW.

Key facts

StatusUnder construction
Facility power16 MW (range 7.9 MW to 25 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 13,096 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates61.71487, 27.32769

Power and grid

Grid carbon intensity59 g CO₂ per kWh (Finland, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2%
Industrial power priceEUR 0.076 per kWh (Finland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayLow (<10%) (Finland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Mikkeli use?

We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Mikkeli?

The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.