Data center in Łódź
Data center in Łódź is an operational data center in Łódź, Poland. Our footprint estimate of its power is about 5.7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.7 MW (range 2.8 MW to 9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,710 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Łódź |
| Coordinates | 51.78953, 19.50708 |
Power and grid
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.6 °C (2001 to 2025) |
| Cooling degree days | 207 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Łódź use?
We estimate the facility power at about 5.7 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Łódź?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Data centers near Łódź